Page 1 of 1

continue planing the cable layer

Posted: Fri Sep 16, 2022 1:41 pm
by issaaleid1
Hallo, it is actually not a problem, but i want to know if it is possible to make a cable layer which connect the demand points whith the final point.
thanks issa.