Hello,
I see where I can plan using my own road network and with my own demand points, however, I'm wondering if I can input my existing network (fiber and conduit) to prefer existing resources in the design. Is that possible? Thank you, Joe
Ability to use existing network
1 post
Page 1 of 1
1 post
Page 1 of 1